In an architecture office the work is not drawn once and finished: every time the municipality comes back a new revision round opens, and which version was approved has to be hunted for in the email archive.

Preliminary, final, construction, permit and supervision are stages of one project record; the architect in charge and the delivery date sit in fields, and every revision keeps its own date.

Architecture Office CRM

What we set up, and how

  • Run the preliminary design, final design, construction, permit and site supervision stages with the architect in charge and the delivery date; tie the opening of the next stage to a rule during setup
  • Track the permit application, missing files and the municipality's responses, and store the version of every revision
  • Keep structural, mechanical, electrical and landscape contractors in a pool with their past projects and quality scores
  • Track stage-based progress payment deductions, the client payment plan and subcontractor payments from a single place
  • Record the approval at stages that need client approval; let who approved what and when leave a trace, and report approval times and the number of revision rounds
Project Stage ManagementPreliminary design, final design, construction drawings, permit and site supervision are stages of the same project record; the architect in charge and the delivery date sit in fields, and the opening of the next stage is defined during setup.
Permit and Municipality TrackingThe permit process is a record attached to the project; the application date, missing files and the municipality's response are kept in its fields, and every revision is stored with its own date.
Subcontractor PoolA contractor is an account record; the discipline and past projects accumulate under the card, and the suitable ones for a new project are filtered by those fields.
Progress Payments and Payment ProcessesProgress payment lines are attached to the project's stages; client and subcontractor payments are compared on the same project.
Room Schedule and Material SelectionThe material to be used in each room is a list attached to the project record; the product chosen, its alternative and the client's selection date sit in fields, and rooms awaiting a selection stay open on the list without falling into the construction stage.
Contract and Design Approval TrackingEvery stage requiring approval is marked on the record; who approved what and when stays as a trace, and approval time and revision rounds are reported from those traces.

In an architectural job the source of delay is not the drawing but the waiting time: the client approving the material selection, the municipality coming back on the file, the structural engineer delivering the calculation. Because none of this waiting appears in the office's own calendar, when a project slips, whose turn it was waiting on is argued about after the fact.

Rapitek CRM keeps every wait as a stage on the record; whose turn it is, how long it has been sitting there and which round it is become measurable. Because the progress payment item is also opened from the same record when a stage is completed, the collection plan stays tied to the actual progress of the work rather than being tracked in a separate spreadsheet.

Frequently asked questions

How are AutoCAD or Revit files managed in the CRM?
The file itself is uploaded as an attachment to the record, or the link to it on your cloud drive is added to the record; the CRM does not open drawing software. Which version is current, who changed it and when, and which revision round it belongs to sit in the fields of the project record.
What about several architects working on the same project?
More than one architect can be assigned to each stage; the owner field and the hour record are kept separately per person. The hour-cost report is taken from the total of those fields.
How do you model permit processes?
The permit type (new build, alteration, amendment) is a field on the record and each type uses its own stage flow. Municipality feedback, revision requests and missing files are kept in the fields of the same record; which file is waiting with whom is read from the list.
How is the progress payment process managed?
The stage-based payment plan in the contract is defined in the CRM. When a stage is completed, the progress payment item is opened on the record and the invoice record is created from that item; the client notification and the late payment reminder are defined attached to the same record. Official e-document generation is not done in the CRM.